If your court has become very worn and started breaking up under foot you are going to require a resurface which consists of pressure cleaning your court and drilling holes in the surface 500mm apart and back filling with pee shingle to give the new court surface good drainage. We then dig up the old tennis ground sockets and concrete new post fixings. Once work is complete we can lay a 40mm open textured porous 6mm macadam sports surface. Once the resurface is complete the court needs to be left for about two weeks for the surface to cure. When the surface has cured we can then come and colour coat the surface and apply the lines.